We will be performing emergency maintenance on the MX01 SmarterMail server today at 6PM MDT (12:00AM UTC) in order to replace the failed Power Distributor and get the server back to 100% working order. We expect this to take about an hour (60 minutes). During this time email will not be able to be sent or received.
Once Power Distributor is replaced, the server will return to full performance as we’ve had to turn down the RAID’s performance as well as throttle the CPU to keep power usage under control as the Power Supply the server is currently running with is undersized.
Thank you for your patience during this time.